Emergency Power Solution for Ethiopia’s Power Crisis
  • Client: Ethiopia Electric Power Corporation (EEPCO)
  • Project: 30MW Debre Zeit Emergency Diesel Power Plant
  • Location: Debre Zeit, Ethiopia

In 2008, Ethiopia faced a significant power shortage due to a severe drought that drastically reduced the water levels in the country’s hydroelectric dams. This led to widespread power outages and a pressing need for an immediate and reliable power supply solution

Objectives

Provide an emergency power supply to mitigate the power shortage.

Deploy and operationalize the power plant in the shortest time possible.

Ensure continuous power supply to the national grid with minimal downtime.

Maintain full operations and maintenance (O&M) to ensure the plant's optimal performance.

Solution

ENCOMM POWER proposed and implemented a turnkey solution involving the installation of a 30 MW diesel power plant. The key components and features of the solution included:

  • Capacity: 30 MW (33kV) power plant.
  • Equipment: 30 units of Caterpillar XQ2000 containerized 1,600 gensets, based on CAT 3516 engines.
  • Deployment: Mobilized and commissioned the plant in a record 60 days.
  • Operation: Supplied power to the national grid 24/7.
  • Maintenance: Full operations and maintenance provided by ENCOMM POWER.

Implementation

During the mobilization and commissioning phase, ENCOMM POWER’s engineering team worked tirelessly around the clock to deploy and commission the power plant within an impressive 60-day timeframe. The logistics were efficiently managed to ensure the seamless transportation and installation of the containerized gensets. Once operational, the plant provided a continuous and reliable power supply to the national grid 24/7. To maintain optimal performance, regular maintenance checks and real-time monitoring were implemented, ensuring the plant operated at peak efficiency.

The project faced several challenges, including logistical constraints due to the remote location, which required careful planning and execution to overcome transportation difficulties. Additionally, maintaining operational efficiency was crucial; this involved ensuring minimal downtime and promptly addressing any technical issues to maintain a steady power supply. Despite these challenges, ENCOMM POWER successfully delivered a robust and reliable emergency power solution for Ethiopia.

The 30MW Debre Zeit Emergency Diesel Power Plant project exemplifies ENCOMM POWER’s capability to deliver rapid, reliable, and efficient power solutions in crisis situations. By mobilizing and commissioning the plant in a record 60 days and maintaining full operation for over two years, ENCOMM POWER played a crucial role in alleviating Ethiopia’s power shortage and supporting the national grid.